Please call us (08) 9359 4166

Our Outstanding Projects

BHP - Finucane Island

  • Complete design and installation of hydraulic systems for:
  • Apron feeders
  • Bucket wheel reclaimer
  • Ore stacking machines
  • Conveyor drives
  • Ship loader
  • Complete repairs to Svendborg brakes

BHP - Port Headland (LMP Building)

  • Complete design and installation of power pack and cylinders
  • Complete repairs to Svendborg brakes

Leibherr

  • Overhaul of various hydraulic pumps and valves

Back to top

GEMCO (The Groote Eylandt Mining Company)

  • Design, manufacture and installation of hydraulic systems for:
  • Apron Feeders
  • Conveyor feed chutes

CSBP Wesfarmers

  • Pipe and tube installations for various hydraulic systems
  • New design and installation of hydraulic systems

Rio Tinto - Pilbara Iron (East Intercourse Island, Dampier)

  • Hydraulic upgrade to car dumper ore
  • Car Wheel rail wagon wheel grippers
  • Completed new pipe installation
  • Redesigned and upgraded system components

Rio Tinto - Pilbara Iron (Parraburdoo)

  • Complete overhaul of train loadout system hydraulics
  • Complete repairs to Svendborg brakes
  • Overhaul of apron feeder hydraulicsBack to top

Back to top

Rio Tinto - Pilbara Iron (Brockman)

  • Complete overhaul of apron feeder drive system

Rio Tinto - Pilbara Iron (Marondoo)

  • Complete overhaul of stacker slew drive system

Rio Tinto - Pilbara Iron (Cape Lambert)

  • Complete overhaul of train loadout hydraulic system
  • Complete repair to Svendborg brakes

Rio Tinto - Pilbara Iron - Tom Price

  • Upgrade and load-out hydraulic systems
  • Design, manufacture and installations
  • Primary Crusher crusher apron feeder hydraulics

Back to top